污水廠配電系統(tǒng)提標(biāo)改造工程實(shí)踐
打開文本圖片集
摘 要:以集團(tuán)下屬某污水處理廠配電系統(tǒng)更新改造工程為例,從配電系統(tǒng)設(shè)計(jì)、配電設(shè)施智能化改造、負(fù)荷計(jì)算、施工內(nèi)容及施工重難點(diǎn)等方面詳細(xì)介紹相關(guān)工程,同時(shí)對(duì)比改造工程實(shí)施前后的效果,為其他同類型的污水處理廠配電系統(tǒng)改造提供實(shí)際案例參考。
關(guān)鍵詞:污水處理廠;配電系統(tǒng);設(shè)計(jì);提標(biāo)改造;智能化
中圖分類號(hào):X703 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2095-2945(2022)25-0153-04
Abstract: With the renovation project of the power distribution system of a sewage treatment plant under the group as an exemplar, the project is introduced in detail from the aspects of distribution system design, intelligent transformation of distribution facilities, load calculation, construction contents and construction difficulties, and the effects before and after the implementation of the transformation project are compared. This provides a practical case reference for the transformation of power distribution system in other sewage treatment plants of the same type.
Keywords: sewage treatment plant; power distribution system; design; mark raising transformation; intelligent transformation
隨著“工業(yè)4.0”的技術(shù)應(yīng)用和《中國(guó)制造2025》規(guī)劃的實(shí)施,傳統(tǒng)工廠和企業(yè)陸續(xù)啟動(dòng)新一輪的產(chǎn)業(yè)升級(jí)和管理升級(jí),對(duì)污水處理板塊提出了建設(shè)智能工廠的要求。(剩余3698字)