上海地區(qū)施工勘察在樁基設(shè)計優(yōu)化中的應(yīng)用
——以浦東新區(qū)某技術(shù)研發(fā)大樓項目為例
打開文本圖片集
摘 要:以浦東新區(qū)某技術(shù)研發(fā)大樓工程勘察為例,結(jié)合該擬建建筑場地特殊地質(zhì)條件和建筑物的構(gòu)造,對擬建場地復(fù)雜地質(zhì)條件進行的巖土工程勘察手段及勘察成果進行分析,介紹施工勘察對樁基施工時遇到的問題及優(yōu)化處理方法。本工程施工勘察及樁基設(shè)計優(yōu)化方法對該地區(qū)類似項目具有寶貴的借鑒意義。
關(guān)鍵詞:巖土工程勘察;古河道;施工勘察;PHC樁;樁基承載力
中圖分類號:TV52 文獻標(biāo)志碼:A 文章編號:2095-2945(2022)15-0116-04
Abstract: Taking the engineering investigation of a technology research and development building in Pudong New Area as an example, based on the special geological conditions of the proposed building site and the structure of the building, the geotechnical engineering investigation methods and results of the complex geological conditions of the proposed site are analyzed. The problems encountered in the construction of pile foundation in construction investigation and the optimal treatment methods are introduced. The construction investigation and pile foundation design optimization method of this project have valuable reference significance for similar projects in this area.
Keywords: geotechnical engineering investigation; ancient river course; construction investigation; PHC pile; bearing capacity of pile foundation
上海地區(qū)為軟土地區(qū)[1],中高層建筑基礎(chǔ)形式多采用灌注樁或者預(yù)制樁等樁基礎(chǔ)。(剩余3648字)