基于BIM技術(shù)的鋼筋工程量精細化計算方法研究
打開文本圖片集
摘 要:利用BIM技術(shù)并結(jié)合工程案例從計算規(guī)則、參數(shù)設(shè)置、繪圖方法等方面分析不同因素對鋼筋工程量的影響程度,并提出較為精細化的鋼筋工程量計算方法,以解決因鋼筋工程量計算誤差過大帶來的工程造價增加和現(xiàn)場管理難度加大的問題。
關(guān)鍵詞:BIM技術(shù);鋼筋工程;精細化計算;工程造價
中圖分類號:TU723.3;TU17 文獻標識碼:A
文章編號:1001-5922(2022)02-0157-07
Abstract:According to the use of BIM technology and engineering cases, aspects such as calculation rules, parameter settings, drawing method are focused to analyze the influence of different factors on the reinforcement of quantities, relatively fine steel quantity calculation method is also puts forward in order to solve construction cost increase and on\|site management problem of increasing difficulty due to excessive reinforcement calculation error of quantities.
Key words:BIM technology; reinforcing bar engineering; refinement calculation; building cost of projects
鋼筋是建筑工程中的主要材料之一,鋼筋工程量不僅影響工程的造價,也決定著建筑工程的質(zhì)量。(剩余5073字)